Carol and Phil, a retired couple, live in a semi detached 1970s to 80s property with a cat slide roof and a front facing dormer that creates their upstairs front bedrooms. They noticed that these rooms, which are partly within the roof space, were draughty, noticeably colder and difficult to heat, making them uncomfortable.
Project information
Scope of work
The aim was to make the front first floor rooms warmer, cut the draughts and make them comfortable. The cavity brick walls helped, but did little for these rooms because they sit within the roof space. The real problems were the lack of insulation in the front roof and loft area, and the very little insulation in the timber framed dormer.
The challenge
- As a semi detached house, we could not raise the roof or make the shared dormer wall any deeper.
- There was no internal access to the roof space around the dormer.
- Carol and Phil's circumstances meant they could not live with work going on inside, so everything had to be done from outside.
So we carefully took off the outside tiles and dormer cladding to reach the under insulated spaces, fitted insulation in the roof space and between the dormer studs, then refitted the original cladding, added a new roof membrane and re-laid the tiles.
The solution
We used Kingspan PIR boards at rafter level for the dormer walls, and mineral wool to fill the gaps around the dormer construction in the roof space. The flat roof had already been replaced to Building Regulations, so it needed no further work.
Conclusion
The front bedrooms are now much easier to heat, hold their warmth for longer and give Carol and Phil the comfort they need. Insulation is an unusual upgrade: unlike a new kitchen or a redecorated room, it often goes unnoticed. Visitors may not see it, but Carol and Phil will feel the benefit for years to come.
From building site to finished home.
The dormer wall opened up from outside, with insulation boards fitted between the studs. The after photo shows the same kind of cat slide roof on another Cobalt project.
Before
After
What this project cost.
These are our published guide ranges for the work in this project, not the final invoice. Every house is different, so your own price comes from a survey.
Tiles and dormer cladding removed, insulation fitted at rafter level and between the dormer studs, a new roof membrane, and everything refitted from outside.
The individual measures behind that number
£4,500 to £11,000
£400 to £900
£250 including VAT, refunded against any work ordered
These are guide ranges for a typical Nottinghamshire property, including labour, materials and VAT. Insulation is currently zero rated for VAT until 31 March 2027. Roof access, membrane and tiling work is priced per job once we can see the building.
Spread the cost over months, or over years.
Interest free credit over 12 months on orders up to £70,000, or fixed rate finance over three to five years. Applications go through Ideal4Finance, and you will see the full figures before you commit to anything.